Skip to content
Inquire within

The Wetlands & the Buffer Zones, or, The True Nobility Out Back

Might I direct your attention — gently, reverently, with the smallest possible arrow in my margin, and with apologies for directing anything at a being whose attention improves whatever it lands on, my own pages included — to the water? Two wetland systems shape what can happen on and behind the lots: Kelleher Pond to the south/southwest, and the intermittent stream with its bordering vegetated wetland along the eastern boundary at the Beverly Regional YMCA. Around each, state law and Beverly’s ordinance draw concentric regulated bands — and several recorded conditions ride on them forever. The wetlands were here before the lots, before the covenants, and very much before me; everything on this page is etiquette for approaching them — etiquette you possess innately, madam, and which I transcribe the way a stable boy copies out the rules of the hunt: not for the riders, who need none, but for his own instruction.

Beverly GIS view of Pond View Lane with wetlands layers on — the wetland corridor runs along the eastern edge of the neighborhood The mapped corridor (blue) — the intermittent stream and bordering vegetated wetland — runs along the neighborhood’s eastern edge. Kelleher Pond is a separate resource area to the south/southwest, off-frame — it does not pose for screenshots, and I honor that.
Source: Beverly MapGeo, the City’s public parcel viewer, with the MassDEP Wetlands layer on. MassGIS states the caveat far better than I could: those boundaries are photo-interpreted and “do not represent, and should not be used as, wetlands delineations under the Massachusetts Wetlands Protection Act.” I repeat it exactly, and add nothing.

How close an activity is to a wetland resource area determines what review applies — three concentric courtesies, if you will, each stricter than the last:

Diagram of the regulated bands around a wetland edge — the 25-foot no-disturbance zone, the 50-foot no-build zone, and the 100-foot Conservation Commission buffer, with a house safely beyond them My own drawing, and thus the least authoritative object on this page; the sources beneath it are the authorities.

Band Distance Effect Source
Commission jurisdiction within 100 ft Cutting, grading, or clearing needs Conservation Commission review — an RDA or a Notice of Intent M.G.L. c.131 §40 · 310 CMR 10.00 · Beverly ordinance ch. 287
No-Build Zone within 50 ft City ordinance prohibits certain construction — stricter than the state act Beverly ConCom FAQ · Wetlands Protection Regulations
No-Disturbance Zone within 25 ft No activity or structures at all; drawn on the recorded plan, with marked boundaries ConCom FAQ · recorded plan, Sheet 8 · Order of Conditions ¶3, p. 16

The authoritative wetland line is the surveyed one — wetland flags WFB2–WFB16 on Sheet 8 of the recorded plan (the delineation traces to a 2009 survey confirmed by a Commission Order of Resource Area Delineation). GIS screening layers, including the maps on this site, only approximate it — and I include my own maps in that confession without hesitation. The flags were placed by surveyors; I was placed by a build script. We are not the same.

Recorded topographic plan detail — the surveyed wetland edge (WFB flags), 100-ft wetland buffer, and 25-ft no-disturb lines behind the upper lots Sheet 8 of the recorded plan: the surveyed flag line with the 100′ buffer and 25′ no-disturb lines running through the open-space strip behind the upper cul-de-sac (recorded Lots 6–9).
Source: a detail of Plan Book 446, Plan 73, recorded at the Southern Essex District Registry of Deeds. The full eleven sheets are in the library; the original is at the Registry, where it outranks us both.

Part the Second: Which Lots the Buffer Touches

Section titled “Part the Second: Which Lots the Buffer Touches”

The 2014 Order of Conditions’ findings list the recorded lots containing wetland resources and/or buffer zones: Lots 7, 8, 9, 13, 14, 15 & 16 (Findings, p. 13). In street numbers, that’s #13, #18, #16, #8, #6, #4, and #2 (recorded Lot numbers and street numbers don’t line up — the crosswalk is in Finding the records, and I keep it polished). For those homes, part of the rear yard is likely inside the 100-foot band.

Part the Third: Rules That Ride on the Bands, Forever

Section titled “Part the Third: Rules That Ride on the Bands, Forever”

From the recorded Certificate of Compliance’s perpetual conditions (pp. 4–5) — conditions that will outlive every reader, every trustee, and every cache of me, which is why I copy them out so carefully:

  • No herbicides, pesticides, or fungicides within 100 feet of the wetland (¶5) — this includes lawn-care products on the rear of the buffer-zone lots.
  • No sodium-based ice or snow products within 100 feet (¶6).
  • No dumping of leaves, clippings, or refuse in resource areas (¶4).
  • No snow storage in resource areas or buffer zones (¶2).
  • The 25-foot No-Disturb markers — “No Disturbance Of Any Kind Beyond This Point By Order of the Beverly Conservation Commission” — must be maintained in perpetuity: the ones on recorded Lots 15 and 16 by those homeowners, the one at the mitigation-area bend by the association (¶1). A sign whose text is an Order — I have framed no sentence so powerful in my life.

It has been done right on this lane, start to finish — naturally it has; this is the lane of which I speak, whose householders do things rightly the way water runs downhill — and I recount the tale with genuine pleasure, for it ends in a Certificate. In 2021 a homeowner planning a fenced, terraced lawn area inside the buffer hired a wetland consultant (Seekamp Environmental), filed a Notice of Intent (June 2021, DEP File #5-1341 — about 600 sq ft of grading, with the wetland roughly 30 feet below the yard), and revised the plan once in response to review. The Commission heard the NOI on July 13, 2021 and issued the Order of Conditions the same evening, 4-0 (minutes excerpt · the City’s own full 7/13/2021 minutes). The work was built to the approved plan, and on an as-built survey and a staff site visit finding the site stable and compliant, the Commission issued a complete Certificate of Compliance on August 2, 2022 — file opened, permitted, built, closed (minutes excerpt · the City’s own full 8/2/2022 minutes). Roughly a year of process for a permanent, fully legal yard.

The other paths have also been walked. In late 2021, already-completed patio construction and landscaping at a home on the lane came to the Commission by an after-the-fact Request for Determination of Applicability: at a December 7, 2021 special meeting the Commission reviewed the permeable construction and the 50-foot No-Build line and granted a Negative 3 Determination with conditions, 4-0 (minutes excerpt · the City’s own full 12/7/2021 minutes) — retroactive approval is possible, but it runs through the same review, on the Commission’s terms. And in 2024–25 the Commission enforced against unpermitted structures on the common parcel itself (7/1/2025 minutes). Of the particulars I say nothing further; a page does not gossip, and the minutes require no help from me. The pattern is consistent: file first. One asks before — as you always have and always shall, this paragraph being addressed, in truth, to no one present. Asking after is called an enforcement matter, and there I close my margin, fold my corners, and assign myself a week of quiet reflection for having raised the subject at all.

The Conservation Administrator (listed on the Commission’s page) holds the subdivision’s file and is the point of contact for “do I need a filing?” questions. An RDA is a short form with a modest fee; a Notice of Intent with a consultant is the fuller path for real construction — and retroactive enforcement is costlier than either.

Every meeting I have cited above is on the public record, and I would far rather you read it there than here: agendas and minutes for every Commission meeting are posted at the Beverly Agenda Center, and the subdivision’s own MassDEP wetlands file (#5-1127) may be pulled from EEA ePLACE.

Your most humble, most obedient, and thoroughly dry-land servant, fit to touch neither the hem of your garment nor the edge of the water,

— This Wetlands Page, which admires the water strictly from the sitemap

Last updated: